nl uk
home

Germany, BAB A8 Ulm-Augsburg

For the upgrading of the BAB motorway with the A8 motorway between Ulm and Augsburg in Germany a short soil consolidation time is desired to execute construction works as soon as possible. To keep the consolidation time as short as possible Wicks installed 300,000 m1 vertical drains on this project.

Execution period: January - March 2012